Cult of Sea

Maritime Knowledge base

  • Home
  • Knowledge base
    • Bridge Equipment
    • Cargo Work
    • Deck
    • General
    • Gmdss
    • Maritime Law
    • Marpol
    • MLC 2006
    • Meteorology
    • Navigation
    • Safety
    • Security
    • Ship Construction
    • Ship Handling
    • Ship Stability
    • Shippie’s Escape
    • Surveys
    • Tankers
  • Colreg’s (ROR)
    • Index (Colreg’s)
    • Part A- General
      • Rule 1 – Application
      • Rule 2 – Responsibility
      • Rule 3 – General Definitions
    • Part B- Steering and Sailing
      • Section 1 (Rule 4 -10)
        • Rule 4 – Application
        • Rule 5 – Lookout
        • Rule 6 – Safe Speed
        • Rule 7 – Risk of collision
        • Rule 8 – Action to avoid collision
        • Rule 9 – Narrow Channels
        • Rule 10 – Traffic separation schemes
      • Section 2 (Rule 11 – 18)
        • Rule 11 – Application
        • Rule 12 – Sailing vessels
        • Rule13 – Overtaking
        • Rule 14 – Head on situation
        • Rule 15 – Crossing situation
        • Rule 16 – Action by give-way vessel
        • Rule 17 – Action by stand-on vessel
        • Rule 18 – Responsibilities between vessels
      • Section 3 (Rule 19)
        • Rule 19 – Conduct of vessels in restricted visibility
    • Part C- Lights and Shapes
      • Rule 20 – Application
      • Rule 21- Definitions
      • Rule 22 – Visibility of lights
      • Rule 23 – Power-driven vessels underway
      • Rule 24 – Towing and pushing
      • Rule 25 – Sailing vessels underway and vessels under oars
      • Rule 26 – Fishing vessels
      • Rule 27 – Vessels N.U.C or R.A.M
      • Rule 28 – Vessels constrained by their draught
      • Rule 29 – Pilot vessels
      • Rule 30 – Anchored vessels and vessels aground
      • Rule 31 – Seaplanes
    • Part D- Sound and Light Signals
      • Rule 32 – Definitions
      • Rule 33 – Equipment for sound signals
      • Rule 34 – Manoeuvring and warning signals
      • Rule 35 – Sound signals in restricted visibility
      • Rule 36 : Signals to attract attention
      • Rule 37 – Distress signals
    • Part E- Exemptions (Rule 38)
      • Rule 38 – Exemptions
    • Part F – Verification of compliance with the provisions of the Convention
      • Rule 39 – Definitions
      • Rule 40 – Application
      • Rule 41 – Verification of compliance
    • Annexes
      • Annex 1 – Positioning and technical details of lights and shapes
      • ANNEX II – Additional Signals for Fishing Vessels Fishing in Close Proximity
      • ANNEX III – Technical Details of Sound Signal Appliances
      • ANNEX IV – Distress Signals
  • Glossary
  • Contact

Harmonized System of Survey and Certification (HSSC)

Harmonized System of Survey and Certification

A harmonized system of survey and certification covering international shipping regulations adopted by the International Maritime Organization enters into force on 3 February 2000. It harmonizes survey procedures and survey dates for all major ship certificates, instead of having different survey procedures and dates for certificates under different conventions.Harmonized System of Survey and Certification (HSSC) was brought about with the sole objective of simplifying and systemizing the survey and certification of ships. This will ensure that survey works will not be duplicated e.g. … [Read more...]

By Cult of Sea Filed Under: Surveys Tagged With: 36 months, 5 years, additional survey, annual survey, certification, harmonized, hssc, initial survey, intermediate survey, loadline, marpol, periodical survey, renewal survey, solas, survey, system

Simple Colregs COS Ad

Join Our List

Subscribe to our mailing list and get interesting stuff and updates to your email inbox.

Powered with ♥ by Cult of Sea

instagram-button

What others are reading

Hot work on ships

Hot Work – Definition, Responsibility, Process and Risks On-board Ships

Tanker Terminology used in Shipping

Master Pilot Exchange – Duties, Responsibilities and Elements of effective Relationship

Part C Lights and Shapes

Rule 27 – Vessels N.U.C or R.A.M

GPS (Global Positioning System)

Stamps

Ship’s you need to sail on before you die!

Discharge of sewage

alarp risk

What is ALARP and why do you need to know it?

cgc_hollyhock_man_overboard_drill

Man Overboard – Manoeuvers you need to know to save a life

AIS network - fleetmon.com

AIS (Automatic Identification System)

Ballast Water Exchange

Ballast Water Management – Merchant Ships

Cargo Calculations – Tanker Work

Documentary-Credit-System-Shipping-Icons8

Documentary Credit System in Shipping – Basics Explained with Flowchart

Bucket List

For Every Man at Sea – the most vital adventure checklist

Notice of Readiness cover

Notice of Readiness (NOR) – Definition, Contents & Requirements


About Us | Terms | Contact Us | Sitemap | Marine Glossary (BETA)

Cult of Sea®™ · Made with ❤ by a small band of sailors