Cult of Sea

Maritime Knowledge base

  • Home
  • Knowledge base
    • Bridge Equipment
    • Cargo Work
    • Deck
    • General
    • Gmdss
    • Maritime Law
    • Marpol
    • MLC 2006
    • Meteorology
    • Navigation
    • Safety
    • Security
    • Ship Construction
    • Ship Handling
    • Ship Stability
    • Shippie’s Escape
    • Surveys
    • Tankers
  • Colreg’s (ROR)
    • Index (Colreg’s)
    • Part A- General
      • Rule 1 – Application
      • Rule 2 – Responsibility
      • Rule 3 – General Definitions
    • Part B- Steering and Sailing
      • Section 1 (Rule 4 -10)
        • Rule 4 – Application
        • Rule 5 – Lookout
        • Rule 6 – Safe Speed
        • Rule 7 – Risk of collision
        • Rule 8 – Action to avoid collision
        • Rule 9 – Narrow Channels
        • Rule 10 – Traffic separation schemes
      • Section 2 (Rule 11 – 18)
        • Rule 11 – Application
        • Rule 12 – Sailing vessels
        • Rule13 – Overtaking
        • Rule 14 – Head on situation
        • Rule 15 – Crossing situation
        • Rule 16 – Action by give-way vessel
        • Rule 17 – Action by stand-on vessel
        • Rule 18 – Responsibilities between vessels
      • Section 3 (Rule 19)
        • Rule 19 – Conduct of vessels in restricted visibility
    • Part C- Lights and Shapes
      • Rule 20 – Application
      • Rule 21- Definitions
      • Rule 22 – Visibility of lights
      • Rule 23 – Power-driven vessels underway
      • Rule 24 – Towing and pushing
      • Rule 25 – Sailing vessels underway and vessels under oars
      • Rule 26 – Fishing vessels
      • Rule 27 – Vessels N.U.C or R.A.M
      • Rule 28 – Vessels constrained by their draught
      • Rule 29 – Pilot vessels
      • Rule 30 – Anchored vessels and vessels aground
      • Rule 31 – Seaplanes
    • Part D- Sound and Light Signals
      • Rule 32 – Definitions
      • Rule 33 – Equipment for sound signals
      • Rule 34 – Manoeuvring and warning signals
      • Rule 35 – Sound signals in restricted visibility
      • Rule 36 : Signals to attract attention
      • Rule 37 – Distress signals
    • Part E- Exemptions (Rule 38)
      • Rule 38 – Exemptions
    • Part F – Verification of compliance with the provisions of the Convention
      • Rule 39 – Definitions
      • Rule 40 – Application
      • Rule 41 – Verification of compliance
    • Annexes
      • Annex 1 – Positioning and technical details of lights and shapes
      • ANNEX II – Additional Signals for Fishing Vessels Fishing in Close Proximity
      • ANNEX III – Technical Details of Sound Signal Appliances
      • ANNEX IV – Distress Signals
  • Glossary
  • Contact

Biological Sewage Treatment Plant “BIOMASTER”

Operating Principle Biological Sewage Treatment System DVZ-SKA- BIOMASTERThe Biological Sewage Treatment system consists of three watertight compartments and other equipment:1. Pre-treatment Tank2. Treatment Tank3. Disinfecting Tank4. Other Equipment (pumps, blowers, dosing pumps, level sensor)PRE-TREATMENT TANKThe "black water" is fed through the pipeline using gravity or a vacuum and flows through the sewage inlet into the pre-treatment tank, where intensive sedimentation and pre-treatment takes place using oxygen, a continuous supply of which is provided by a … [Read more...]

By Cult of Sea Filed Under: Marpol Tagged With: biological, biomaster, marpol, sludge, treatment tank

Simple Colregs COS Ad

Join Our List

Subscribe to our mailing list and get interesting stuff and updates to your email inbox.

Powered with ♥ by Cult of Sea

instagram-button

What others are reading

Chipping

What is Chipping ? Tools, Precautions & Protection

Part C Lights and Shapes

Rule 28 – Vessels constrained by their draught

Gas Tanker Types

Gas Tanker – Types, Tanks, Reliquefaction & Cargo handling opertions

Regulation 15

Control of operational discharge of oil (Machinery Spaces)

Multi gas detector

Multi-Gas Detector – Tanker Instruments

Harmonized System of Survey and Certification

Harmonized System of Survey and Certification (HSSC)

Master Pilot Exchange – Duties, Responsibilities and Elements of effective Relationship

Anchoring System and Components

Anchoring System and its Components On-board Ships

Rule 19 – Conduct of vessels in restricted visibility

Amplitude

The Marine Chronometer featured image

The Marine Chronometer

Single Point Mooring Operation

SPM (Single Point Mooring) or SBM Operations

Passage Planning

Passage Planning

pyrotechnics

Pyrotechnics

Part D - Sound and Light Signals

Rule 34 – Manoeuvring and warning signals


About Us | Terms | Contact Us | Sitemap | Marine Glossary (BETA)

Cult of Sea®™ · Made with ❤ by a small band of sailors