Cult of Sea

Maritime Knowledge base

  • Home
  • Knowledge base
    • Bridge Equipment
    • Cargo Work
    • Deck
    • General
    • Gmdss
    • Maritime Law
    • Marpol
    • MLC 2006
    • Meteorology
    • Navigation
    • Safety
    • Security
    • Ship Construction
    • Ship Handling
    • Ship Stability
    • Shippie’s Escape
    • Surveys
    • Tankers
  • Colreg’s (ROR)
    • Index (Colreg’s)
    • Part A- General
      • Rule 1 – Application
      • Rule 2 – Responsibility
      • Rule 3 – General Definitions
    • Part B- Steering and Sailing
      • Section 1 (Rule 4 -10)
        • Rule 4 – Application
        • Rule 5 – Lookout
        • Rule 6 – Safe Speed
        • Rule 7 – Risk of collision
        • Rule 8 – Action to avoid collision
        • Rule 9 – Narrow Channels
        • Rule 10 – Traffic separation schemes
      • Section 2 (Rule 11 – 18)
        • Rule 11 – Application
        • Rule 12 – Sailing vessels
        • Rule13 – Overtaking
        • Rule 14 – Head on situation
        • Rule 15 – Crossing situation
        • Rule 16 – Action by give-way vessel
        • Rule 17 – Action by stand-on vessel
        • Rule 18 – Responsibilities between vessels
      • Section 3 (Rule 19)
        • Rule 19 – Conduct of vessels in restricted visibility
    • Part C- Lights and Shapes
      • Rule 20 – Application
      • Rule 21- Definitions
      • Rule 22 – Visibility of lights
      • Rule 23 – Power-driven vessels underway
      • Rule 24 – Towing and pushing
      • Rule 25 – Sailing vessels underway and vessels under oars
      • Rule 26 – Fishing vessels
      • Rule 27 – Vessels N.U.C or R.A.M
      • Rule 28 – Vessels constrained by their draught
      • Rule 29 – Pilot vessels
      • Rule 30 – Anchored vessels and vessels aground
      • Rule 31 – Seaplanes
    • Part D- Sound and Light Signals
      • Rule 32 – Definitions
      • Rule 33 – Equipment for sound signals
      • Rule 34 – Manoeuvring and warning signals
      • Rule 35 – Sound signals in restricted visibility
      • Rule 36 : Signals to attract attention
      • Rule 37 – Distress signals
    • Part E- Exemptions (Rule 38)
      • Rule 38 – Exemptions
    • Part F – Verification of compliance with the provisions of the Convention
      • Rule 39 – Definitions
      • Rule 40 – Application
      • Rule 41 – Verification of compliance
    • Annexes
      • Annex 1 – Positioning and technical details of lights and shapes
      • ANNEX II – Additional Signals for Fishing Vessels Fishing in Close Proximity
      • ANNEX III – Technical Details of Sound Signal Appliances
      • ANNEX IV – Distress Signals
  • Glossary
  • Contact

Lifting Operations Onboard Ship

Lifting Operation

Lifting Operations  - Do's and Dont's 1 Every lifting operation must be -(a) properly planned;(b) appropriately supervised, and(c) carried out in a safe manner.2 No lifting operation should be begun using equipment which is mobile or can be dismantled unless the employer is satisfied that the lifting equipment will remain stable during use under all foreseeable conditions taking into account the nature of the surface on which it stands.3 All lifting operations must be properly planned, appropriately supervised and carried out to protect the safety of workers. Whilst this … [Read more...]

By Cult of Sea Filed Under: Cargo Work Tagged With: cargo gear, cargo handling, Cargo Work, lifting, lifting gear, rope, slings, thimble

mariner-gps
Sail Time
Simple Colregs COS Ad

Join Our List

Subscribe to our mailing list and get interesting stuff and updates to your email inbox.

Powered with ♥ by Cult of Sea

instagram-button

What others are reading

Technical Aspects of GMDSS Equipments

Technical Aspects of GMDSS Equipments – Propagation, Modulation, Terrestrial Equipment & Antenna

Hot work on ships

Hot Work – Definition, Responsibility, Process and Risks On-board Ships

Iron fire

Pyrophoric Iron Fires

Regulation 15

Control of operational discharge of oil (Machinery Spaces)

Part F - Verification of Compliance

Rule 39 – Definitions

Solar System

Solar system and Kepler’s law of Planetary Motion

Lifeboat – General Requirements

Hatch Covers

Hatch Cover and Access Lids

Combustible Gas Indicator or (Explosimeter) – Tanker Instruments

Surface Preparation Standards

ship-speed

Slow Speed Control

Dragging Anchor

How do you make out if the Anchor is dragging?

IALA Buoyage System

Tanker Terminology used in Shipping

Condition Assessment Scheme (CAS)

Condition Assessment Scheme (CAS)


About Us | Terms | Contact Us | Sitemap | Marine Glossary (BETA)

Cult of Sea®™ · Made with ❤ by a small band of sailors