Cult of Sea

Maritime Knowledge base

  • Home
  • Knowledge base
    • Bridge Equipment
    • Cargo Work
    • Deck
    • General
    • Gmdss
    • Maritime Law
    • Marpol
    • MLC 2006
    • Meteorology
    • Navigation
    • Safety
    • Security
    • Ship Construction
    • Ship Handling
    • Ship Stability
    • Shippie’s Escape
    • Surveys
    • Tankers
  • Colreg’s (ROR)
    • Index (Colreg’s)
    • Part A- General
      • Rule 1 – Application
      • Rule 2 – Responsibility
      • Rule 3 – General Definitions
    • Part B- Steering and Sailing
      • Section 1 (Rule 4 -10)
        • Rule 4 – Application
        • Rule 5 – Lookout
        • Rule 6 – Safe Speed
        • Rule 7 – Risk of collision
        • Rule 8 – Action to avoid collision
        • Rule 9 – Narrow Channels
        • Rule 10 – Traffic separation schemes
      • Section 2 (Rule 11 – 18)
        • Rule 11 – Application
        • Rule 12 – Sailing vessels
        • Rule13 – Overtaking
        • Rule 14 – Head on situation
        • Rule 15 – Crossing situation
        • Rule 16 – Action by give-way vessel
        • Rule 17 – Action by stand-on vessel
        • Rule 18 – Responsibilities between vessels
      • Section 3 (Rule 19)
        • Rule 19 – Conduct of vessels in restricted visibility
    • Part C- Lights and Shapes
      • Rule 20 – Application
      • Rule 21- Definitions
      • Rule 22 – Visibility of lights
      • Rule 23 – Power-driven vessels underway
      • Rule 24 – Towing and pushing
      • Rule 25 – Sailing vessels underway and vessels under oars
      • Rule 26 – Fishing vessels
      • Rule 27 – Vessels N.U.C or R.A.M
      • Rule 28 – Vessels constrained by their draught
      • Rule 29 – Pilot vessels
      • Rule 30 – Anchored vessels and vessels aground
      • Rule 31 – Seaplanes
    • Part D- Sound and Light Signals
      • Rule 32 – Definitions
      • Rule 33 – Equipment for sound signals
      • Rule 34 – Manoeuvring and warning signals
      • Rule 35 – Sound signals in restricted visibility
      • Rule 36 : Signals to attract attention
      • Rule 37 – Distress signals
    • Part E- Exemptions (Rule 38)
      • Rule 38 – Exemptions
    • Part F – Verification of compliance with the provisions of the Convention
      • Rule 39 – Definitions
      • Rule 40 – Application
      • Rule 41 – Verification of compliance
    • Annexes
      • Annex 1 – Positioning and technical details of lights and shapes
      • ANNEX II – Additional Signals for Fishing Vessels Fishing in Close Proximity
      • ANNEX III – Technical Details of Sound Signal Appliances
      • ANNEX IV – Distress Signals
  • Glossary
  • Contact
You are here: Home / glossary / PLAN

PLAN

PLAN

Created OnFebruary 13, 2018
byCapt. Angad S Cheema
Print
You are here:
  • Glossary
  • P
  • PLAN
< Back to Glossary Index

The area or imaginary surface defined by or within any described lines. In ship-building, the Plan of Elevation, commonly called the SHEER DRAUGHT, is a side-plan of the ship, defined by a surface limited by the head afore, by the stern abaft, the keel below, and the upper side of the vessel above. The Horizontal Plan, commonly called the HALF BREADTH PLAN, comprehends all the lines describing the greatest breadth and length of the ship at different heights or sections. This is named half-breadth plan, because both sides of the ship being exactly alike, only one-half is represented. To the foregoing must be added, the Plan of Projection, commonly called the BODY PLAN, which exhibits the outline of the principal timbers, and the greatest heights and breadths of the same.

Related:

  • Arrived ship
  • ROLLING
  • Hog (Hogging)
  • Dreadage or Dreading Clause
  • Brackish water arrival draught (BWAD)
  • Bar draught

By Capt. Angad S Cheema

mariner-gps
Sail Time
Simple Colregs COS Ad

Join Our List

Subscribe to our mailing list and get interesting stuff and updates to your email inbox.

Powered with ♥ by Cult of Sea

instagram-button

What others are reading

Fire Wires or Emergency Towing-off Pennants

Fire Wires or Emergency Towing-off Pennants (ETOP’s), MEG 4, ISGOTT Edn 6th Recommendations

Part C Lights and Shapes

Rule 25 – Sailing vessels underway and vessels under oars

Part C Lights and Shapes

Rule 22 – Visibility of lights

Part B - Section 2

Rule 11 – Application

GPS (Global Positioning System)

Deck Water Seal – Inert Gas System on Tankers

The Pivot Point

Part B - Section 1

Rule 7 – Risk of collision

Passage Planning

Passage Planning in or near ice limit

policy

What is a Marine Policy? Basics you need to know!

Condition Assessment Programme CAP

Condition Assessment Programme (CAP)

Magnetic Compass and Ships Magnetism

Magnetic Compass & Ship Magnetism – Simplified Explanation

General Average York Antwerp Rules

What is General Average & the importance of York-Antwerp Rules ?

Anchoring System and Components

Anchoring System and its Components On-board Ships

Ship Stability Definitions related to Hydrostatic Particulars


About Us | Terms | Contact Us | Sitemap | Marine Glossary (BETA)

Cult of Sea®™ · Made with ❤ by a small band of sailors