Cult of Sea

Maritime Knowledge base

  • Home
  • Knowledge base
    • Bridge Equipment
    • Cargo Work
    • Deck
    • General
    • Gmdss
    • Maritime Law
    • Marpol
    • MLC 2006
    • Meteorology
    • Navigation
    • Safety
    • Security
    • Ship Construction
    • Ship Handling
    • Ship Stability
    • Shippie’s Escape
    • Surveys
    • Tankers
  • Colreg’s (ROR)
    • Index (Colreg’s)
    • Part A- General
      • Rule 1 – Application
      • Rule 2 – Responsibility
      • Rule 3 – General Definitions
    • Part B- Steering and Sailing
      • Section 1 (Rule 4 -10)
        • Rule 4 – Application
        • Rule 5 – Lookout
        • Rule 6 – Safe Speed
        • Rule 7 – Risk of collision
        • Rule 8 – Action to avoid collision
        • Rule 9 – Narrow Channels
        • Rule 10 – Traffic separation schemes
      • Section 2 (Rule 11 – 18)
        • Rule 11 – Application
        • Rule 12 – Sailing vessels
        • Rule13 – Overtaking
        • Rule 14 – Head on situation
        • Rule 15 – Crossing situation
        • Rule 16 – Action by give-way vessel
        • Rule 17 – Action by stand-on vessel
        • Rule 18 – Responsibilities between vessels
      • Section 3 (Rule 19)
        • Rule 19 – Conduct of vessels in restricted visibility
    • Part C- Lights and Shapes
      • Rule 20 – Application
      • Rule 21- Definitions
      • Rule 22 – Visibility of lights
      • Rule 23 – Power-driven vessels underway
      • Rule 24 – Towing and pushing
      • Rule 25 – Sailing vessels underway and vessels under oars
      • Rule 26 – Fishing vessels
      • Rule 27 – Vessels N.U.C or R.A.M
      • Rule 28 – Vessels constrained by their draught
      • Rule 29 – Pilot vessels
      • Rule 30 – Anchored vessels and vessels aground
      • Rule 31 – Seaplanes
    • Part D- Sound and Light Signals
      • Rule 32 – Definitions
      • Rule 33 – Equipment for sound signals
      • Rule 34 – Manoeuvring and warning signals
      • Rule 35 – Sound signals in restricted visibility
      • Rule 36 : Signals to attract attention
      • Rule 37 – Distress signals
    • Part E- Exemptions (Rule 38)
      • Rule 38 – Exemptions
    • Part F – Verification of compliance with the provisions of the Convention
      • Rule 39 – Definitions
      • Rule 40 – Application
      • Rule 41 – Verification of compliance
    • Annexes
      • Annex 1 – Positioning and technical details of lights and shapes
      • ANNEX II – Additional Signals for Fishing Vessels Fishing in Close Proximity
      • ANNEX III – Technical Details of Sound Signal Appliances
      • ANNEX IV – Distress Signals
  • Glossary
  • Contact

Convention on the International Regulations for Preventing Collisions at Sea, 1972 (COLREGs)

The 1972 Convention was designed to update and replace the Collision Regulations of 1960 which were adopted at the same time as the 1960 SOLAS Convention. Technical provisions The COLREGs include 41 rules divided into Six Sections:Part A - GeneralPart B - Steering and SailingPart C - Lights and ShapesPart D - Sound and Light signalsPart E - ExemptionsPart F - Verification of compliance with the provisions of the ConventionThere are also four Annexes containing technical requirements concerning lights and shapes and their positioning; sound signaling appliances; … [Read more...]

By Cult of Sea Filed Under: *Index (ROR) Tagged With: COLREG, colregs, imo, part f, ror, rule 39, rule 40, rule 41, rules, rulesofroad

mariner-gps
Simple Colregs COS Ad

Join Our List

Subscribe to our mailing list and get interesting stuff and updates to your email inbox.

Powered with ♥ by Cult of Sea

instagram-button

What others are reading

Part C Lights and Shapes

Rule 24 – Towing and pushing

General Average York Antwerp Rules

What is General Average & the importance of York-Antwerp Rules ?

International Institutions and their Association with Shipping (ILO, WHO, ISF, ICS, BIMCO, SIGTTO, OCIMF)

Hatch Covers Cover

Hatch Covers – Function, Inspection, Tests, Precautions, Operation, Maintenance

Iron fire

Pyrophoric Iron Fires

Narrow Channels

Rule 9 – Narrow Channels

Regulation 15

Control of operational discharge of oil (Machinery Spaces)

work and rest

Hours of work and rest – MLC 2006

The provisions of MERCHANT SHIPPING ACT 1958 regarding Certificate of Registry

The Marine Chronometer featured image

The Marine Chronometer

Death On board – Master Responsibility as per MSA 1958

Epirb

EPIRB – Performance Standards (406Mhz)

The Inclining Experiment

The Inclining Experiment – Ascertain the GM of Vessel

Part C Lights and Shapes

Rule 23 – Power-driven vessels underway

Part B - Section 2

Rule 11 – Application


About Us | Terms | Contact Us | Sitemap | Marine Glossary (BETA)

Cult of Sea®™ · Made with ❤ by a small band of sailors