Cult of Sea

Maritime Knowledge base

  • Home
  • Knowledge base
    • Bridge Equipment
    • Cargo Work
    • Deck
    • General
    • Gmdss
    • Maritime Law
    • Marpol
    • MLC 2006
    • Meteorology
    • Navigation
    • Safety
    • Security
    • Ship Construction
    • Ship Handling
    • Ship Stability
    • Shippie’s Escape
    • Surveys
    • Tankers
  • Colreg’s (ROR)
    • Index (Colreg’s)
    • Part A- General
      • Rule 1 – Application
      • Rule 2 – Responsibility
      • Rule 3 – General Definitions
    • Part B- Steering and Sailing
      • Section 1 (Rule 4 -10)
        • Rule 4 – Application
        • Rule 5 – Lookout
        • Rule 6 – Safe Speed
        • Rule 7 – Risk of collision
        • Rule 8 – Action to avoid collision
        • Rule 9 – Narrow Channels
        • Rule 10 – Traffic separation schemes
      • Section 2 (Rule 11 – 18)
        • Rule 11 – Application
        • Rule 12 – Sailing vessels
        • Rule13 – Overtaking
        • Rule 14 – Head on situation
        • Rule 15 – Crossing situation
        • Rule 16 – Action by give-way vessel
        • Rule 17 – Action by stand-on vessel
        • Rule 18 – Responsibilities between vessels
      • Section 3 (Rule 19)
        • Rule 19 – Conduct of vessels in restricted visibility
    • Part C- Lights and Shapes
      • Rule 20 – Application
      • Rule 21- Definitions
      • Rule 22 – Visibility of lights
      • Rule 23 – Power-driven vessels underway
      • Rule 24 – Towing and pushing
      • Rule 25 – Sailing vessels underway and vessels under oars
      • Rule 26 – Fishing vessels
      • Rule 27 – Vessels N.U.C or R.A.M
      • Rule 28 – Vessels constrained by their draught
      • Rule 29 – Pilot vessels
      • Rule 30 – Anchored vessels and vessels aground
      • Rule 31 – Seaplanes
    • Part D- Sound and Light Signals
      • Rule 32 – Definitions
      • Rule 33 – Equipment for sound signals
      • Rule 34 – Manoeuvring and warning signals
      • Rule 35 – Sound signals in restricted visibility
      • Rule 36 : Signals to attract attention
      • Rule 37 – Distress signals
    • Part E- Exemptions (Rule 38)
      • Rule 38 – Exemptions
    • Part F – Verification of compliance with the provisions of the Convention
      • Rule 39 – Definitions
      • Rule 40 – Application
      • Rule 41 – Verification of compliance
    • Annexes
      • Annex 1 – Positioning and technical details of lights and shapes
      • ANNEX II – Additional Signals for Fishing Vessels Fishing in Close Proximity
      • ANNEX III – Technical Details of Sound Signal Appliances
      • ANNEX IV – Distress Signals
  • Glossary
  • Contact
You are here: Home / Cargo Work / Lifting Operations Onboard Ship
Lifting Operation

Lifting Operations Onboard Ship

Lifting Operations  – Do’s and Dont’s

1 Every lifting operation must be –

(a) properly planned;

(b) appropriately supervised, and

(c) carried out in a safe manner.

2 No lifting operation should be begun using equipment which is mobile or can be dismantled unless the employer is satisfied that the lifting equipment will remain stable during use under all foreseeable conditions taking into account the nature of the surface on which it stands.

3 All lifting operations must be properly planned, appropriately supervised and carried out to protect the safety of workers. Whilst this applies to all vessels, it is particularly important where cranes are being used on work boats and other small vessels as overloading of the crane, or attempting to lift at the wrong angle could, in some circumstances, result in the vessel sinking.

4 No person should be lifted except where the equipment is designed or specially adapted and equipped for the purpose or for rescue or in emergencies.

5 Contact with bare ropes and warps with moving parts of the equipment should be minimised by the installation of appropriate protective devices.

6 Weather conditions can play a significant part in the carrying out of lifting operations whether in the open air or within the vessel. In the former case, high winds or wave action can, for example, cause suspended loads to swing dangerously or cause mobile equipment to topple. Movement of the ship due to wind or wave action can also have a similar effect in relation to lifting operations inside the ship. Consideration should be given to the effects of weather conditions on all lifting operations whether inside the ship or outside on the deck, and such operations should be suspended before conditions deteriorate to the extent that lifting becomes dangerous.

Related Article:   BLU Code - Code Of Practice For The Safe Loading And Unloading Of Bulk Carriers

 7 Loads should if possible not be lifted over a person or any access way, and personnel should avoid passing under a load which is being lifted.

 8 All loads should be properly slung and properly attached to lifting gear, and all gear properly attached to appliances.

 9 The use of lifting appliances to drag heavy loads with the fall at an angle to the vertical is inadvisable because of the friction and other factors involved and should only take place in exceptional circumstances where the angle is small, there is ample margin between the loads handled and the safe working load of the appliance, and particular care is taken. In all other cases, winches should be used instead. Derricks should never be used in union purchase for such work.

 10 Any lifts by two or more appliances simultaneously can create hazardous situations and should only be carried out where unavoidable. They should be properly conducted under the close supervision of a responsible person, after thorough planning of the operation.

11 Lifting appliances should not be used in a manner likely to subject them to excessive overturning moments.

 12 Ropes, chains and slings should not be knotted.

 13 A thimble or loop splice in any wire rope should have at least three tucks with a whole strand of rope and two tucks with one-half of the wires cut out of each strand. The strands in all cases should be tucked against the lay of the rope. Any other form of splice which can be shown as efficient as the above can also be used.

Related Article:   Heavy Lift Cargo - Precautions and Stability Changes Onboard Merchant Ships

 14 Lifting gear should not be passed around edges liable to cause damage without appropriate packing.

15 Where a particular type of load is normally lifted by special gear, such as plate clamps, other arrangements should only be substituted if they are equally safe.

16 The manner of use of natural and man-made fibre ropes, magnetic and vacuum lifting devices and other gear should take proper account of the particular limitations of the gear and the nature of the load to be lifted.

17 Wire ropes should be regularly inspected and treated with suitable lubricants. These should be thoroughly applied so as to prevent internal corrosion as well as corrosion on the outside. The ropes should never be allowed to dry out.

18 Cargo handling equipment that is lifted onto or off ships by crane or derrick should be provided with suitable points for the attachment of lifting gear, so designed as to be safe in use. The equipment should also be marked with its own gross weight and safe working load.

19 Before any attempt is made to free equipment that has become jammed under load, every effort should first be made to take off the load safely. Precautions should be taken to guard against sudden or unexpected freeing. Others not directly engaged in the operation should keep in safe or protected positions.

20 When machinery and, in particular, pistons are to be lifted by means of screw-in eye bolts, the eye-bolts should be checked to ensure that they have collars, that the threads are in good condition and that the bolts are screwed hard down onto their collars. The screw holds for lifting bolts in piston heads should be cleaned and the threads checked to see that they are not wasted before the bolts are inserted.

Related Article:   Pyrophoric Iron Fires

Related:

  • BLU Code - Code Of Practice For The Safe Loading And…
  • Ballast Water Management - Merchant Ships
  • International Institutions and their Association…
  • Condition Assessment Scheme (CAS)
  • Port State Control (PSC) - An agreed regime for the…
  • Hatch Covers - Function, Inspection, Tests,…

By Cult of Sea Filed Under: Cargo Work Tagged With: cargo gear, cargo handling, Cargo Work, lifting, lifting gear, rope, slings, thimble

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Simple Colregs COS Ad

Join Our List

Subscribe to our mailing list and get interesting stuff and updates to your email inbox.

Powered with ♥ by Cult of Sea

instagram-button

What others are reading

Employment Agreement

Seafarers employment agreements – MLC 2006

Ship's magnetic compass

Ship’s Magnetic Compass – Dry and Wet Compass with their care, maintenance and bubble removal

intact stability

Intact Stability – Tankers

GPS (Global Positioning System)

Bill of Lading

Maritime – What is a Bill of Lading (B/L)?

Part F - Verification of Compliance

Rule 41 – Verification of compliance

Part B - Section 1

Rule 8 – Action to avoid collision

Thermal Protective Aid – Requirements as per SOLAS

Principles of Ship Handling

Tanker Terminology used in Shipping

Visual Storm (Cyclone) Warning Signals for Indian Sea Ports

Part C Lights and Shapes

Rule 20 – Application

Using Magnetic compass in Polar Regions

Edible oil

Recommended Practices for Storage and Transport of Edible Oils and Fats

Single Point Mooring Operation

SPM (Single Point Mooring) or SBM Operations


About Us | Terms | Contact Us | Sitemap | Marine Glossary (BETA)

Cult of Sea®™ · Made with ❤ by a small band of sailors